南京市某星级酒店暖通空调工程设计

时间:2018-11-14 16:27来源:毕业论文
南京市某星级酒店暖通空调工程设计,建筑层数为地下一层、地上十二层,建筑总面积为56013㎡,建筑总高度为48.6m,地下一层为车库、厨房和设备用房,地上一层为商铺、办公和餐饮,

摘要本毕业设计课程为南京市某星级酒店暖通空调工程设计,建筑层数为地下一层、地上十二层,建筑总面积为56013㎡,建筑总高度为48.6m,地下一层为车库、厨房和设备用房,地上一层为商铺、办公和餐饮,二、三层为会议、包房和大餐厅,四至十一层为标准客房,十二层为标准客房和总统套房。各层要求通风与空调,冬季要求供暖,并设置必要的防排烟。
本设计采用离心式制冷机组和燃气锅炉作为冷热源。一层小面积商铺采用风机盘管加独立新风,西餐厅,会议厅等大空间建筑采用全空气系统,并满足防火分区要求。二三层包房、会议室等小空间满足即开即停,所以采用独立新风加风机盘管,中餐厅、宴会厅等大空间设计对的全空气系统。四到十二层为标准客房和套房,全采用风机盘管加独立新风。由于该系统属于中小系统,故水系统采用异程式。对卫生间和更衣室等不是人长久停留地方设置排风。防排烟设计中,楼梯间、楼梯前室、合用前室设计火灾时正压送风,过道及大空间采用机械排烟。地下室停车厂及设备用房单独做通风排烟设计。30180
关键词  全空气系统  独立新风  独立新风   防排烟
 毕业论文设计说明书外文摘要
Title    Design of HVAC system for a Stars Hotel in Nanjing City                     
Abstract
The course of the graduation design for Nanjing a five-star hotel HVAC engineering design, building layers of twelve basement, ground floor, a total construction area of for 56013 m2, building a total height of 48.6 m, underground a layer of garage, kitchen and equipment with real, to a layer of shops, offices and restaurants, the second and third layer for meetings, dining rooms and restaurants, four to 11 standard rooms, the 12 story standard rooms and presidential suites. Each layer requires ventilation and air conditioning, winter heating, and set the necessary smoke control.
This design uses the centrifugal refrigeration unit and the gas boiler as the cold heat source. A small area of shops with fan coil unit plus independent outdoor air, West restaurant, conference room and other large space building uses the air system, and meet the fire partition requirements. Two three storey rooms, meeting rooms, and other small space to meet the open stop, so the independent fresh air fan coil unit, restaurants, banquet halls and other large space design of the entire air system. Four to twelve levels for the standard rooms and Suites, the use of fan coil plus independent outdoor air. Since the system belongs to the medium and small system, the water system uses different programs.. The bathrooms and locker room not long stay local exhaust. Smoke exhaust design, staircase, the stairs antechamber, combined with anterior fire design of positive pressure air supply, aisle and large space with mechanical smoke exhaust. The design of ventilation and smoke extraction for the parking lot and the equipment used in the basement.
Keywords   Independent outdoor air system, Independent outdoor fresh air smoke
 目   次
1  工程概况与环境参数    1
1.1  工程概况    1
1.2  设计依据    1
1.3  设计任务    2
1.4  室内外设计计算参数    2
1.5  土建资料    3
2  负荷计算说明书    5
2.1  冷负荷理论依据    5
2.2  冬季热负荷    10
2.3  负荷分析    12
3  系统方案设计    15
3.1  冷热源确定    15 南京市某星级酒店暖通空调工程设计:http://www.youerw.com/gongcheng/lunwen_25768.html