滁州港重力式码头设计+图纸

时间:2022-02-23 22:52来源:毕业论文
进行了滁州港重力式方块码头的设计,具体包括对拟建码头装卸工艺的设计,平面布置的设计,荷载计算,设计码头的尺寸选择,抗滑、抗倾验算,设计码头的整体验算,及分项工程的

摘要随着滁州市国民经济快速发展及长江三角洲地区经济一体化进程不断推进,对于 物流运输提出更高的要求,在铁路、公路运输较为完备的情况下,加快水路运输建设, 增强市场竞争力,使得滁州市区具备完善的综合交通运输体系,也是符合国家关于建 设节约型社会、实现经济和社会的可持续发展的总体要求。滁州市区周边现有滁洲经 济技术开发区、承接产业转移示范园区、苏滁现代产业园、汉河新区等,入驻企业众 多,货运总量大,对于的水路运输需求十分迫切。安徽省港航建设投资集团有限公司 在滁州汊河拟建设 4 个 1,000t 级泊位。78249

在本课程设计中,我依据滁州港地质条件,水文资料,设计要求进行了滁州港重 力式方块码头的设计,具体包括对拟建码头装卸工艺的设计,平面布置的设计,荷载 计算,设计码头的尺寸选择,抗滑、抗倾验算,设计码头的整体验算,及分项工程的 施工工艺与施工组织设计,经过计算确保各方面符合要求,确定码头建设计划。

毕业论文关键词:滁州港 重力式码头 方块码头 方案设计 施工组织

Abstract With the rapid development of national economy and Chuzhou Yangtze River Delta regional economic integration process progresses, higher demands for logistics and transport in railway, road transport more complete situation, accelerate the construction of water transport, give full play to water transportation tariffs low, the unique advantages of large transport capacity, and enhance market competitiveness, so Chuzhou urban  areas have improved the integrated transport system, is also in line with the country's overall requirements for the construction of a conservation-oriented society to achieve sustainable development of economy and society。 Chuzhou Chuzhou urban area surrounding the existing economic and technological development zones, to undertake industrial transfer demonstration zone, Su Chu modern industrial park, the Han River District, etc。, many enterprises settled, large cargo volume for water transport demand is very urgent。 Construction Investment Group Co。, Ltd。 in Anhui Province Wharf in Chuzhou Branch River plans to build four berths 1,000t。

In this course design, I based on geological conditions of Hong Kong Chuzhou, hydrological data, design requirements for the design of Hong Kong Chuzhou Gravity Block Quay, specifically including the proposed terminal handling process design, layout design, load calculation, design Wharf the size selection, skid, anti-dumping checking, checking the overall design of the pier, and construction technology and construction organization design sub-project, has been calculated to ensure that all aspects of compliance, to determine the terminal building plan。

Key  words : Chuzhou  port  Gravity  Wharf  Block  Quay  Design Construction Organization

目录

第一章 绪论 1

第二章 自然条件 3

2。1 施工地理条件 3

2。2 水文 3

2。3 地质 3

2。4 风况资料 3

2。5 雾况 4

2。6 允许作业天数 4

2。7 施工前的准备任务 4

2。7。1 技术方面的准备 4

2。7。2 物资方面的准备 滁州港重力式码头设计+图纸:http://www.youerw.com/gongcheng/lunwen_90149.html