毕业论文

打赏
当前位置: 毕业论文 > 土木工程 >

镇江市化学研究院办公楼工程量清单及清单计价编制

时间:2020-06-14 10:26来源:毕业论文
工程量清单计价方式必将得到广泛的应用,工程量清单及编制也是招标人和投标人都应加以研究和解决的问题。本文主要从清单编制内容、原则、步骤展开,并且总结清单编制过程中存

摘要工程量清单是建设单位编制建设工程标底价、投标报价和工程结算时适时调整工程量的主要依据,实行工程量清单计价可有效地控制投资、可有效地保护甲乙双方的利益。随着我国市场经济体制的不断发展,工程量清单计价方式必将得到广泛的应用,工程量清单及编制也是招标人和投标人都应加以研究和解决的问题。本文主要从清单编制内容、原则、步骤展开,并且总结清单编制过程中存在的主要问题,提出解决问题的方案。最后,选取镇江市化学研究院办公楼设计资料,根据GB50500—2008《建筑工程工程量清单计价规范》、2004年《江苏省建筑与装饰工程计价表》等,编制办公楼的工程量清单表、清单计价表、措施项目清单与计价表等,在过程中具体介绍清单编制步骤与注意事项,从而掌握工程量清单编制的主要知识,提高编制清单的能力。50898

毕业论文关键词:工程量清单  工程量   清单计价

Abstract Engineering quantity list is a price the preparation of to be a the tender engineering bidding price, and are the to adjust the basis for of the engineering the amount of in the when the balance sheet of the Tender quotes and engineering, the implementation of the engineering quantity list of-denominated to be effective in control the investment, can effectively protect the interests of the Party A and Party B the two sides. With the continuous development of China's market economy, the Bill of Quantities way is bound to be widely used, BOQ and the preparation is tender and the bidder should be studied and solved. This paper mainly the preparation of the contents of from the list, the commencement of the principle of, Step, and summarizes the main problems exists in the process of list of the preparation of, also submit proposals for the solution of the program of the problem. Finally, select the design information of the office building of the Zhenjiang City, Research Institute of Chemistry, According to the GB50500-2008 "building works engineering quantity list-denominated norms", in 2004 ", Jiangsu Province, Architectural and Decorative in Project Valuation table" and so on, the engineering of the preparation of the office building the amount of table of the list of, list of-denominated table, measures the list of items with the-denominated table, and so on , in the process Intro the  preparation of the inventory the steps with the pay attention to matters in order to master the main knowledge of the preparation of by the engineering quantity list, improve the  ability to of the preparation of the inventory.

Keywords: bill of quantities   engineering quantity   List Valuation

目  录

第一章 绪论 1

1.1选题背景及意义 1

1.1.1选题背景 1

1.1.2选题意义 1

1.2工程量清单计价的研究现状 1

1.2.1工程量清单计价的国外研究现状 1

1.2.2工程量清单计价的国内研究现状 2

1.3本文框架 2

第二章 工程量清单计价模式 3

2.1工程量清单 3

2.1.1工程量清单的概念 3

2.1.2工程量清单的主要组成部分 3

2.2工程量清单计价 4

2.2.1工程量清单计价的概念 4

2.2.2工程量清单计价的优点 镇江市化学研究院办公楼工程量清单及清单计价编制:http://www.youerw.com/gongcheng/lunwen_54346.html

------分隔线----------------------------
推荐内容